Skip to product information
1 of 7

Tops

Tops Docket Gold Project Planner, 8-1/2" x 11-3/4", Top-Wire Bound, Project Rule, Poly Cover, 70 Sheets (99710) - White

Tops Docket Gold Project Planner, 8-1/2" x 11-3/4", Top-Wire Bound, Project Rule, Poly Cover, 70 Sheets (99710) - White

Regular price $26.99 USD
Regular price $26.99 USD Sale price $26.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

Brand: Tops

Color: White

Features:

  • Project ruling provides instant organization for notes, plans & deadlines
  • Premium-weight paper is Letr-Trim perforated to detach easily
  • Top-bound snag-resistant coil & extra-strong back are ideal for notes on the go
  • Poly cover, 8-1/2' x 11-3/4', 70 sheets
  • Proudly made in the USA

Binding: office_product

Number Of Pages: 70

Release Date: 04-04-2023

model number: 99710

Part Number: 99710

Details: The TOPS Docket Gold Project Planner has premium, project-ruled paper to capture action notes, deadlines and priorities. A snag-resistant top coil is ideal for lefties. The sturdy cover and extra-strong back create a durable record of your project. Letr-Trim perforated. 8-1/2' x 11-3/4', Top Bound. Poly cover. 70 Sheets.

EAN: 0025932997105

Package Dimensions: 12.0 x 8.5 x 0.6 inches

View full details